NEWS

MikeViktorVikto welcomes Leen VDB!

Leen joins the MikeViktorViktor team and will operate as office manager.

 
 

Foam it!

loading...
  • House extension foam model

Our project in Zwijndrecht for the extension of a house enters an exciting new phase. The cupola made with EPS (expanded polystyrene) is now fully engineered and a scale model will be made soon. The cupola radically combines structure, insulation and waterproofing in one single element and can be modeled in all thinkable shapes.
Check the website regularly to see the first pics of this innovative experiment!

 
 

NEWS

Lessius goes public

loading...
  • Lessius construction site

    Lessius construction site

  • Lessius construction site

    Lessius construction site

Friday we presented our project for the Lessius Hogeschool on site to inform the neighbourhood. Hot tomato soup and woolen gloves already transformed the site into a warm habitat!
Construction will start in the first week of February. More images soon.

 
 

TWEET

Vanessa Paradis

loading...

Now that Vanessa has arrived we finally feel at home in our new office.

 
 

NEWS

MikeViktorViktor factory

loading...
  • mikeviktorviktor office

MikeViktorViktor moved to a new location during the Christmas holidays.
Check out our new headquarters at Steenhouwersvest 61, 2000 Antwerp. Always welcome to visit for free coffee and cookies!

 
 

NEWS

 
 

URGENT

 
 

NEWS

All rise!

loading...
  • School facade brick

    School facade brick

  • School gebouw Lummen interieur klaslokaal

    School gebouw Lummen interieur klaslokaal

We are preparing tendering documents for the School project in Lummen.

 
 

SEXY

Riverside housing

loading...
  • Render Sint Pietersvliet appartments

MikeViktorViktor is commissioned for the design of 4 apartments in Antwerp. The narrow site has quite some potential due to its location close to the river Schelde and an intimate nearby square.
The units are organized in a rational way in order to maximize space and living quality. If you’re interested in a fancy city loft you’ll have to hurry!

 
 

NEW

Forum Lauwe

loading...
  • Cultural Centre Lauwe

    Cultural Centre Lauwe drawing plan

  • Cultural Centre Lauwe

    Cultural Centre Lauwe model foyer

In the far west of Belgium, near the French border, the city of Lauwe is planning a new cultural centre. Located on the bank of the river Leie the site is part of a greater ambitious masterplan. The new CC intends to be a beacon in this new development.
Our proposal introduces a large multi-functional hall in the heart of the building. Foyer and back stage area are located at both ends of the hall. The central space opens up towards a public square on one side and towards a park on the other side. The new CC is intended as an open forum enabling all kinds of scenario’s.
A large roof structure covers this open forum. Within this volume all technical infrastructure, like lighting and theatrical equipment, are hidden. The roof acts as a hovering horizontal beacon, laying alongside the river and giving shelter to all public and cultural life.

 
 

NEW

The social house

loading...
  • Model Office building

Competition entry for a new office building. More news soon!

 
 

2nd place!

Innovating Turnhout

loading...
  • Turnhout masterplan model

    Turnhout masterplan model

  • Turnhout masterplan plan

    Turnhout masterplan plan

  • Turnhout masterplan model

    Turnhout masterplan model

MikeViktorViktor turned out second for this closed competition for the design of a masterplan for the area around the station of Turnhout. The competition was part of the Open Oproep procedure of the Vlaamse Bouwmeester.
The competition started with an ambitious brief of the city of Turnhout. The current worn down station area had to be transformed into a vibrant, innovation pole. The city dreamed of an attractive neighborhood where young startups and spin-offs could find appropriate space combined with several functions in the care sector.
The proposal aims at creating an interesting mix of the different functions instead of having isolated islands of mono functional program. Elderly, entrepreneurs, public, private, … all mixed together creating a lively neighborhood where ideas and activities can emerge.
In order to achieve this a new system of boulevards is laid out. The boulevards organize traffic and define the public space and the building blocks. The building blocks rise in height towards the central public space axis running through the site and up to the city centre. The blocks contain a wide variety of typologies ranging from classic row houses to studio’s with care service. Commercial functions are also compatible with these typologies enhancing the mixture of functions.
Finally, a large building is positioned along the railroad, the pioneer building, acting as a horizontal landmark. The building synthesizes the ambitions of the site in a single volume: an interesting mix of office space, housing with care services, commercial activities organized around a central canyon-like space enhancing interaction and communication.

 
 

1st place!

Lessius is more.

loading...
  • Lessius Hogeschool rendering interieur

    Lessius Hogeschool rendering interieur

  • Lessius Hogeschool rendering interieur

    Lessius Hogeschool rendering interieur

MikeViktorViktor architects and A2D architects submitted their proposal for the reconversion of an old apartment building into student housing for the Lessius University College. The housing block is located across the Tropical Institute of Antwerp in the Kronenburgstraat, just a stone’s throw away from one of the most vibrant areas in Antwerp. The jury appreciated the clear schemes and duplex offices on the ground floor. We liked the jury’s appreciation…

 
 

1st place!

A school with a view

loading...
  • School gebouw Lummen model

    School gebouw Lummen model

  • School gebouw Lummen model

    School gebouw Lummen model

In the summer of 2010 MikeViktorViktor won a competition for a new primary school for the town of Lummen. After a year of financial fine-tuning the project can restart. We’re elaborating the project at this moment and aiming to submit tender documents by Christmas 2011.
Given the large program the real challenge here is to design an adequate volume with the necessary spatial qualities while maximizing the playground surface. Therefor the several classrooms are organized in a very rigid way, along a broad corridor. The corridor shifts every level offering views over the playground and the green surroundings respectively.

 
 

NEW

A mountain arises.

loading...
  • Care building model pic

This month we presented a new building for the care sector. By stacking the program in a compact volume the large site is liberated and transformed into an attractive green space. The building is conceived as a pavilion in an open garden. Parking space for customers and personnel is organized in a circular parking lot, half sunken. The highly insulated upper volume and the ‘cold’ lower volume make an interesting energy exchange possible. On top of the parking lot the garden landscape consists of an outer perimeter of trees and bushes and an inner medicinal garden. The building stands at the centre, three levels high. The floor plan enlarges every level shading the lower level and giving the building an intriguing sculptural shape. A new subtle beacon emerges along the ringroad!

 
 

UPDATE

Turn up the volume.

loading...
  • Jeugdcentrum zaal

Final touch is being given to the tender documents of the project for a Youth Centre in the town of Liedekerke. The project has been elaborated thoroughly in order to solve all acoustic, thermal, and structural challenges. In the end the solution consists of a box in a box concept. An outer concrete box acts as rain shield and gives the Centre a solid, fortress-like look. Inside a highly insulated wooden box contains several multifunctional halls. This space is designed as an enfilade of top lit rooms making all kinds of activities possible. Between the concrete and the wooden box circulation and storage spaces form a thermal and acoustical barrier. According to the season the building and the activities within will open up outwards or shrink back to the insulated spaces.
If all goes well the execution phase will start after the summer. Looking forward to that!

 
 

NEWS

House in Westmalle: construction has started.

loading...
  • WVD rooflight execution

Construction is speeding up for our project in Westmalle. The new volume arises quickly as the wooden structure is being erected. I’m curious what the facade will be?

 
 

NEWS

Cooking recipes for PIVA.

loading...
  • PIVA Antwerpen collage

MikeViktorViktor has entered the competition for the Cook and Hotel School in Antwerp. The competition for a new building on the existing campus consists of 4 different professional kitchens, two dining halls, a bar and some administration offices. The proposed intervention boldly answers the request for a landmark building with a single floor building. The new building also structures the site and complements the landscaping. We presented the project on recipe cards in a cute little box on a red felt pillow with a red ribbon. Another Deluxe project by MikeViktorViktor.

 
 

NEWS

Books do furnish a room.

loading...
  • Bibliotheek Halle collage

    Bibliotheek Halle collage park

  • Bibliotheek Halle collage

    Bibliotheek Halle collage gevel

  • Bibliotheek Halle snede

    Bibliotheek Halle snede maquette

MikeViktorViktor submitted a competition for the library of Halle. The open competition for the extension of the library was met with an incredible team consisting of MikeViktorViktor, Bureau Bouwtechniek, Arthuur De Roover structural engineering, AA&O technical advisors and Yves Coussement, visual artist. The project re-examined the site conditions and proposed a simple yet daring construction. The library stands chance to evolve into a new type of service, where the different media of books, DVD’s and CD’s, comic books etc are arranged in a novel way.

 
 

NEWS

 
 

HOT!!

Shop till you drop.

loading...
  • Shopping Houthalen Oost

MikeViktorViktor is asked to enlarge and upgrade an old supermarket. The proposed strategy consists of the precise addition of a number of new elements: a large billboard welcomes customers from the road, a wide canopy marks the entrance and provides sun shading, at the rear a covered platform accommodates the deliveries. Instead of replacing the existing facade by a thin layer a series of architectonic elements are added. These elements, uniform in cladding, create a new identity and an enhanced functioning for the supermarket.

 
 

NEW

Blow that horn!

loading...
  • podiumzaal dessel

    Podiumzaal dessel collage

  • podiumzaal dessel

    maquette podiumzaal dessel

  • podiumzaal dessel

    schema podiumzaal dessel

  • podiumzaal dessel

    schets podiumzaal dessel

Before leaving on summer holiday we submitted this competition proposal for a new flexible music hall for the town of Dessel.
Located in the centre of Dessel just off the central square the site offers a lot of potential. The programs consists mainly of a large flexible music hall, a local music school, a nursery, a café and an apartment for the concierge.
The design combines the several programmatic elements in one single building, making a bold gesture along the central square and fitting in with the row houses at the same time. The building envelope is inspired on the neighboring buildings and is simply extruded along the site. Café and nursery sit at both ends of the building: the café looking out over the street, the nursery enjoying the nearby garden. The music hall forms the heart of the building and is a flexible space able to accommodate numerous scenario’s. The music school is situated below the music hall.
The entire building is clad with brass metal sheeting echoing the golden instruments at use within the building. This skin is perforated randomly enabling daylight to penetrate through the building.
Play!

 
 

Improving suburbia.

loading...
  • Woning te Putte

    Woning te Putte maquette

  • Woning te Putte

    Woning te Putte maquette

Once the facade of the house facing the street was the most important facade. This elevation represented the social status of the family and was often the most elaborated elevation. Expensive materials and careful detailing were proof of sophistication and good taste. The backside in contrary was reserved for duty: lines for drying clothes, garages, workrooms, … Where the front was the work of a skilled craftsman the backside was often the result of some quick improvisation.
Nowadays centre of gravity has shifted towards the back. The rundown do-it-yourself structures at the back of the house are gradually being transformed into new living rooms, new spaces where family life unfolds. Living room, kitchen and dining room have thereby blended into one single space. In preference completely glazed towards the garden. As if garden and living room are one continuous space? Somehow during this transformation all fine materials and specific craftsmanship are lost. Readymade plastic structures are glued against the existing masonry, with enormous silicone joints preventing nature to intrude…
In reaction to this we would like to propose some specific spaces, with clear relationships to the garden and the existing house and built out of proper materials.

 
 

1st place!

Leave us kids alone!

loading...
  • Youth centre Liedekerke

    beeld polyvalente zaal
    mikeviktorviktor

  • Youth centre Liedekerke

    schema’s gebouw en gebruik
    mikeviktorviktor

  • Youth centre Liedekerke

    model overview
    mikeviktorviktor

MikeViktorViktor wins the competition for a new youth centre for the town of Liedekerke, in collaboration with A2D architects.
3 institutes come together in 1 new building, each with spaces of their own but also sharing spaces. Quite soon this led us to a star shaped building: 3 legs for the 3 institutes organized around a central event hall. The central hall can be enlarged by opening large doors and encompassing the neighbouring spaces. In that way a multifunctional space is created that adapts to all kinds of events.

The triangular site is characterized by a substantial height difference running through the site. This gives us the opportunity to push one leg halfway in the hillside, while the other two open up to the sports fields. Like a rock the building seems to emerge out the landscape forming a bold gesture.
The building is made to cope with heavy duty. Outside the facade is made of layering in situ concrete. Inside the walls are lined with a wooden finishing, as a continuous billboard announcing the next rock bands. cheers!

 
 

Extension of a house in Borsbeek.

loading...
  • extension house Borsbeek

    extension house borsbeek model

  • extension house Borsbeek

    extension house borsbeek model

  • extension house Borsbeek

    extension house borsbeek model

 
 

1st place!

A new garden for RAC Hasselt

loading...
  • A new garden for RAC Hasselt

  • A new garden for the RAC Hasselt

  • A new garden for RAC Hasselt

The existing surroundings of this office complex are in a bad shape. MikeViktorViktor was asked to present a strategy to enhance this ‘rest’ space.
The strategy is threefold. First, what’s left of the existing garden along the perimeter is transformed into a green buffer. By intensifying this area no more further maintenance is needed. Second, the ever expanding parking area is organized in a number of parking islands along two axes running through the site. Third, a new green space is created in the centre. Defined by two rows of Magnolia’s and an undulating grass surface this space works as an outdoor room linking the different entrances. This room is the new face of the complex and can accommodate all kinds of outdoor activities. I love the RAC now…

 
 

News

Elderly housing, selected for a closed competition

loading...
  • elderly housing wommelgem

    mikeviktorviktor
    model communal space

  • elderly housing wommelgem

    mikeviktorviktor
    model communal space

  • elderly housing wommelgem

    mikeviktorviktor
    communal space sketch

  • elderly housing wommelgem

    mikeviktorviktor
    model facade

brief: 8 apartments for elderly people and 4 social apartments for family’s, located in a residential neighbourhood in a small town in the outskirts of Antwerp, the client is interested in sustainability, the plot is large and a second phase is possible.

We push the ambition of the client a bit further and propose a green building, following the ‘passive house’ standards. Result is a compact, rational building with thick walls. We envisage a wrinkled pigmented concrete facade echoing our inhabitants natural patine. The units are organized in such a way that an interesting communal space emerges. Instead of the usual narrow, dark corridor we are able to open up and enrich this space. Residents can get together here and play some cards or read the newspaper, overlooking the church tower and the nearby school.

 
 

Extension of a House in Zwijndrecht

loading...
  • Extension of a house in Zwijndrecht model

  • Extension of a house in Zwijdrecht model

  • Extension of a house in Zwijdrecht concept

Located in the suburbs of Antwerp the existing house needs some restructuring. We propose to remove the existing structures of poor quality to create a new open space. This room will become the new heart of the house and thereby a stage for everyday life. The space is defined by a roof, hovering above the floor. From outside the roof is a simple box clad in roofing, blending in the built environment. Inside however the roof becomes a magnificent dome, creating a airy and comfortable space.

 
 

Extension of a House in Westmalle

loading...
  • extension of a house in West Malle

  • extension of a house in West Malle

Parasites often work in two ways. On the one hand they are intruders, hanging on to another existing structure and taking advantage of it. On the other hand parasites can also act complementary and contribute to the functioning of the existing structure.
For this house in West Malle we propose to make such a parasite. We want to add something with its own intrinsic qualities but that complements the existing at the same time. Since the house doesn’t relate to the attractive garden and the organization of the different functions in the house doesn’t really work our parasite has the ambition to solve this. Breeding on the existing but giving back essential living quality …

 
 

2nd place

Bredabaan Merksem

loading...
  • Bredabaan Merksem

  • Bredabaan Merksem

The Bredabaan Merksem, once a glorious and uptown shopping street, has unfortunately lost much of its charm nowadays. However, the authorities wish to kiss this import artery back to life.
In this closed competition MikeViktorViktor proposes an elaborated strategy to deal with this phenomenon of decaying public space. Besides important traffic problems one of the main issues is that the entire area lacks identity and character. Therefore we present a new continuous tiling stretching along the boulevard and spreading across the central square. Like vectors the stones guide the way and even light up at night. On the central square a new roof structure is added, mediating between church and town hall. Acting as a outdoor auditorium, a bus stop, a pavilion, a sculpture this structure symbolizes the new ambition of Merksem.

 
 

Buenos Aires Vertical Zoo

loading...
  • Buenos Aires Vertical Zoo

The ambition is to make a structure with magnificent views over the city as well as a green and sustainable tower with ideal environments for the animals housed within.
The tower is conceived as a stacking of blocks, each with its own spatial structure but nevertheless linked by a continuous structural logic. The program is divided over seven blocks. The foot of the tower is made of concrete silos referring to the former industrial buildings and containing all supplies and waste products (water, food, earth, manure, etc). At grade an entrance hall is cut out of this concrete structure where visitors take the elevator to the top where the adventure begins. The top floor contains the actual entrance and a 360º panorama deck. Two different routes descend from here.
The ‘neck’ of the tower is reserved for the birds. A large sky-cage is designed souring 30m high with two routes spiralling down and offering great views and close contact with the birds. Cafeteria and staff functions are situated underneath the birds’ cage. Both levels are designed as a hypostyle hall with elegant columns supporting the upper levels. The cafeteria is extended with an outdoor terrace and observation deck. Back inside views are given on the cave structure beneath.
The Cave structure is the second large animal habitat, a complex three-dimensional space with hills and canyons that provides an optimal landscape for the animals. Visitors can wonder about and enjoy diverse views. The lowest level of this cave structure forms the vaulted ceiling of the auditorium. MUS and auditorium are stacked and form another block. Here large spaces are designed for performances, concerts, lectures, gatherings, celebrations, …
The last block on our trip downwards is the third animal environment. Spread over three levels the smaller animals are housed in a series of stacked cages with public walkways crossing through.
Travelling through the zoo becomes an experience thanks to the differentiated landscapes and jaw dropping views.

 
 

Building bridges

loading...


MikeViktorViktor was asked to do a study for three bridges in Puurs for Stramien architects. The design is part of a greater renewal of the town’s public space. Question is what to do with three existing bridges? Which extra layer can be added to these typical infrastructural elements?

 
 

House in Sint-Job-in't-Goor

loading...
  • House Sint-Job-in-'t-Goor - MikeViktorViktor architecten

    (no description)

  • House Sint-Job-in-'t-Goor - MikeViktorViktor architecten

    (no description)

  • (no description)

  • (no description)

In the woods near Antwerp we are designing a private residence. The site is located on the corner of two roads and has a large garden. The plan is a perfect square, 10.80 × 10.80m. On the ground floor large portions of the volume are cut out to blend indoor and outdoor space.
On the first floor the plan is composed out of nine rooms, two of these are ‘empty’: a winter garden and the double height space of the living room.
The façade will be composed out of Belgian Blue Stone, a dark blue-grey color with a dry milled type finish which gives the stone a satin smooth appearance.
This is no ordinary white villa in the suburbs.

 
 

Extension of a House in Schoten

loading...

We’re adding a new volume to this charming villa in Schoten containing a living room opening up to the garden and the terrace on ground level and a master bedroom hoovering above. We’re investigating different materials for the facade such as brickwork patterns and wood cladding to give this new volume a distinct character. On the one hand respecting the existing villa, on the other hand creating a new identity.

 
 

Haacht Station Area

loading...
  • MikeViktorViktor design for the station area of Haacht.

The planning of a new viaduct over the railway tracks creates a new starting point for the station area of Haacht. Along with the new infrastructure the aim is to make this area into a transferium, where one changes modes of transportation. Our aim was to create a new public space on boths sides of the railroad. Lacking identity, the station area is now extended to include additional program and functions on the square. The public space is thus collecting it’s identity from all activities around. We turned the assignment to include a ‘green’ parking lot for 300 cars upside down and proposed an undulating landscape which ‘could’ incorporate parking spaces. We favor a landscape instead of asphalt. As the counting crows would sing; “they paved paradise to put up a parking lot”.

 
 

Crèche at the seaside

loading...
  • Wedstrijd Kinderkribbe Blankenberge, 2009 MikeViktorViktor architecten

In this competition for a daycare centre for 112 children we really took the opportunity to create something exiting and fresh. Instead of organizing all the rooms along a central corridor we created a large multifunctional central hall where all the rooms would directly connect to. In this way we could eliminate most of the necessary circulation area and combine these m^2^ into a more useful space.
The classrooms or “living-rooms” are organized in pairs and revolve around the central courtyard. The whole plan is conceived like a panopticon because of safety and functional reasons.
The appearance of the building is joyful and colorful, the double layered facade consists out of several materials that together form a kaleidoscopic image. This facade is repeated on the inside central hall. Here lights radiates through like a medieval leaded light.

 
 

Brooklyn startled by Square Egg

Grand Army Plaza is transformed into a qualitative urban space. The hazardous traffic is pushed outwards to create space. In this space a new form is introduced: a square building framing a garden and generating a range of uses along its perimeter.
The courtyard, accessible from the four sides of the square, contains the essence of Olmsted’s landscape: the beautiful Bailey fountain and its surrounding green. A secret garden is created where people can spend time in a cultivated oasis of trees and flowers under the relaxing sound of falling water. The building acts as a multi functional structure composed out of a series of vaulted rooms. The structure is meant to outlive any kind of program. Parts can be used to support the popular Greenmarket, other parts can contain small shops or cafés, yet other parts can provide space for lavatories.
The existing landscape is concentrated in green islands.

 
 

2nd place

Ternat Boogie Woogie

loading...

The site of the youth and sports centre needs a new structure. The design aims at providing an intrinsic plan for the site starting from the current problems laid out by the client. Instead of providing a summary of small solutions for the existing problems a new logic is formulated. A logic that not only solves the current problems but also attempts to be much more.

 
 

4th place

Football Machine

loading...
  • (no description)

  • (no description)

  • (no description)

MikeViktorViktor was invited to make a design for a soccer canteen for the local team KSKL Ternat. Our ambition was to make an extremely functional building combined with a strong evocative power. The building should radiate towards the surroundings but also be inviting to the soccer players and their fans. In short, the building had to become a soccer machine.

The design has two levels. The upper level, situated 2 meters above field level, houses the public functions: canteen with bar and kitchen, press room and lavatories. Underneath this level and half sunken in the ground the program for the players is organized: dressing rooms, lavatories, storage space. Thus the building has two very distinct atmospheres: the ‘catacombs’ from where the players rise to the arena and on top of this the ‘loges’ with splendid views for the public.

A finishing of profiled steel wraps around the façade like a skin and reinforces the image of a strange object in the fields. Glazed parts are protected with nets, a typical element in the world of soccer that provides protection without disturbing the views.

 
 

New Holland Drive 1-250

The assignment of creating a residential environment of 150 single-family housing units and 100 apartments and simultaneously integrating these into the forest, forces us to take position: how to deal with this valuable woodland and create a lively environment suitable to different population groups.
We concentrate the necessary infrastructure and housing to the point of a single strip, running parallel to the Pampushout Dreef and passing under the north-south running coastal road. The high-rise apartments are all combined into one tower, which is also accessed by this 2km long service road. This turns all apartments and houses into a coherent figure with a single address:New Holland Drive 1-250.
This 2 km long Drive is the essential carrier of meaning when explaining the idea of ‘living in the woodland’. Since it serves not just as a clearing in the forest but also as the access road for all the housing units; one is living in the woods simply because of the approach.

Europan 9 – Almere, The Netherlands

 
 

Honourable mention

Watch Tower

loading...

The ambition was not to create a race to the top, but to provide several distinct experiences of the vertical differences that exist in a forest. Therefore two elements were added: the table and the panorama pavilion. The table creates an intermediate pause on the way upward. This gives the opportunity to stay in the crest of the trees. The panorama pavilion floats above the crests, offering the best view in all directions. Thus the route upwards becomes an exploration through all sections of the forest.

 
 

Furniture for a Girl

Every day a dress rehearsal takes place. Often several times a day.
“Which pair of shoes matches this dress?” “Or shall I just wear a jeans?”

 
 

Brussels - A Manifesto

This research has been conducted at the Berlage Institute, Rotterdam, and focuses on the spacial and architectural development of Brussels as the Capital of Europe. It presents strategic interventions for the European Quarter and other parts of Brussels. This study is part of a larger research on the topic of Capital Cities at the beginning of the 21st century and investigates the relationship between ‘urban form’, political institutions and their public representation.

Without doubt, Brussels as the Capital of Europe is a formidable case study of a geopolitical entity that has surpassed the nation-state in terms of sheer size and meaning. The studio has developed an urban vision that combines the different urban realities and political actors of Brussels in such a way that they become all together legible and consistent with the idea of Brussels as the Capital of Europe.

A number of sites were chosen to form constituent parts of an urban composition that represent the idea of Europe within Brussels. The urban forms change the specific context in which they are embedded, while simultaneously becoming a representation of urbanity itself.

Berlage Instituut Research
Participants: Bart Melort; Bernardina Borra; Hiromi Haruki; Weerapat Chokedeetaweeanan; Joachim Declerck; Cristina; Garcia Fontan; Alexa Nürnberger; Konstantinos Pantazis; Marc Ryan; Heng Shi; Pier Paolo Tamburelli; Martino Tattara; Dubravka Vranic; Niklas Veelken; Thomas Weiss; Zhi Yi Yang.


More information here

 
 

Frasheri Park Tirana, Albania

loading...
  • (no description)

  • (no description)

Located at the crossroads of two of the city’s important streets – one ceremonial, the other a prime mobility street – Frasheri Park becomes a key component of a diverse ensemble of central Tirana public spaces. Part green park, part urban plaza, Frasheri Park establishes a striking setting for contemporary city life with the most basic and humble ingredients. The intensions of the design are to put the existing monuments of the Frasheri Brothers in a new landscape topography of hills — ‘a forest clad in green’ with a terra cotta interior – that maximizes existing mature vegetation on site. The plan creates an intimate green core and a more urban plaza in relation to the main boulevard. The hills offer a variety of spatial settings for play and contemplation with different planting themes.

see what others are saying – unfortunately only in Latvian …

 
 

Canyon

loading...

The building is literally cut in two parts by a public canyon. The first part contains tee boxes on different levels and consists of an open structure with floors and columns. The second part houses the other golf functions (front desk, club house, restaurant, dressing rooms, pro shop) and the conference functions. The inner façade towards the canyon is opened up in order to reinforce the relation between both parts.

 
 

Pebble

loading...

The pebble is composed out of several triangular floor slabs stacked on top of each other and rounded off in the corners. On all sides tee boxes are laid out along the perimeter of each floor. In this way a strong rhythm of columns and tee boxes in between is defined around the entire building.
Large openings are cut out of the volume so that daylight can penetrate through the building making it possible to spread out the other functions on every level.

 
 

Face to face

loading...

This typology pushes the relationship between golf and conference to the extreme. The tee box part is built as an open structure of floors and columns. The conference part is situated underground and in front of the tee box structure. The ball is actually played across the underground conference part and makes this the most compact typology.

 
 

 
 

Grand Lake Park Tirana, Albania

loading...

This rehabilitation and design strategy builds upon the foundations of the existing landscape and park elements, carefully highlighting and reinforcing its most promising potentials while selectively editing its problematic areas and setting a new structure in motion to continue to evolve into the future.

Grand Lake Park is five parks in one. As a more broadly differentiated landscape, Grand Lake Park contains 5 distinct character areas that together form a balanced and coherent whole: ‘The Domestic Core’, ‘Forest meets Water’, ‘The Active Forest’, ‘Deep Nature’ and ‘Copa-Tirana’. The new park becomes clearly structured for visitors to access and experience all of its parts, each an invitation to explore the living, dynamic evolution of distinct landscapes over time.

Client: Municipality of Tirana
Design Team: Bart Melort, Marc Ryan, Alexa Nürnberger, Federico Rodriguez, Uli Franzel, Valbona Koçi & Adelina Greca
Tirana Summer Academy, Sponsored by the GTZ, Deutsche Gesellschaft für Technische Zusammenarbeit

 
 

Tirana Central Park

By reconfiguring the latent potentials of the site’s existing topography to maximize spatial experiences, the park’s strategy of intense concentration of differentiated landscapes and public spaces mingles garden ‘rooms’ amongst public institutions, mixing landscape and cultural experiences. The park is as much a ‘heart’ for the city as it is a green ‘lung’. The park concentrates a series of differentiated spaces that are bound together through a central public promenade that unifies a complex site and clearly expresses the idea of one park composed of many garden spaces.

Designed as a flexible framework, the park is conceived to evolve over time according to the changing needs, opportunities and dreams of the city. The park becomes a central condenser of urban and landscape experiences where a citizen can drift into parallel passages through the city, encountering natural and cultural events in a range of spaces that accommodate everything from large social gatherings to intimate escapes.

Client: Municipality of Tirana, in collaboration with Berlage Institute, Rotterdam
Design team: Bart Melort, Bernardina Borra, Alexa Nürnberger, Marc Ryan, Martino Tattara en Lu Zhang
Under the supervision of Edi Rama, Mayor of Tirana
Altin Gagani, Ariela Kushi, Elia Zenghelis and Pier Vittorio Aureli

 
 

Like it!

 
 

Like it!

 
 

Speech

 
 
© 2008 MikeViktorViktor. All rights reserved.